Case Study: Aviation Terminal

In the fast-paced world of aviation, precision and speed are paramount. We're thrilled to share our latest milestone – a groundbreaking Scan-to-BIM project that's set to redefine industry standards. In just 5 weeks, we transformed an expansive 110,000 sqft aviation terminal into a meticulously detailed, Level of Development 300+ BIM model. This case-study unveils how we're soaring to new heights in the aviation sector.

We are still in a state of awe at the speed and detail of this model. Scan2Plan is a game-changer for our Aviation projects
— Thomas L Grassi, FAIA, NCARB, Project Director, Transportation Architecture and Infrastructure- HNTB

Project Overview:

Project Type: Aviation Terminal

Size: Over 110,000 sqft

Scan Duration: Completed in 3 days with a 2-man team

Complex MEPF Scanning: Including above and below ceiling tile, even in active public areas

BIM Creation:

  • Architectural & Structural Model: Completed in 3 weeks

  • MEPF Model: Finalized in 1 week

  • Quality Control: Finalized 1 week

  • Total Project Duration: Approximately 5 weeks

Model Specifications:

Level of Development (LoD): 300+

Compliant with Port Authority BIM Standard

Serves as Foundation for Terminal BIM

Model Contents:

Includes office, restaurant, retail, industrial, structural, MEPF, and transportation components

Accuracy Assurance:

Tolerance Standards: Maintained throughout the entire model

Point Cloud: 0”-⅛”

Revit Model: 0”-½”

V Owen Bush